  • Getting Started - Tutorials
  • Administrator's guide
    • Configuration
    • Maintenance guide
    • Limitations
    • Migration to the Cloud
    • Requirement Yogi Cloud vs Data Center
    • Backup, import and export of Requirement Yogi data across Confluence and Jira instances
      • What are the steps of export / re-import?
      • How to carefully perform the mappings for the backup import/export step?
      • Checking that the Jira mappings are correct
      • Cleaning up links to non-existing Jira issues
      • Backup file structure
      • Database schema for Confluence backups
      • Database schema for Jira backups
      • Deleting the results of an incorrect import in Jira
    • Database schema
    • Changing Applinks
    • Performance
    • Copying, Splitting and Moving pages
    • Choosing the indexing engine
    • Notifications
    • Data Center SLA / Escalation process
    • History - Administrator's guide
  • Features
  • Requirement Yogi for Jira
  • RY Testing and Compliance
  • Integrations
  • APIs
  • Release notes
  • Archives (Legacy Features)
    Calendars
You‘re viewing this with anonymous access, so some content might be blocked.
/
What are the steps of export / re-import?
Updated May 20, 2024

    What are the steps of export / re-import?

    Origin instance

    Destination instance

    Origin instance

    Destination instance

    1. Export to a table*


    2. Write the table to a CSV file

    3. Delete the temporary table

    4. Load the CSV file into the temporary table

    5. Perform the mappings
    (automatically, then manually)

    6. Import the data

    7. Re-start at step 5,
    or delete the temporary table



    Steps 2-3-4 → You can bypass the CSV file by copying the data yourself to the target DB.



    Destructive step

    It erases the target data and replaces it
    with the import.



    * The tables are AO_32F7CE_DBBACKUPITEM and AO_32F7CE_DBBACKUPMAPPING. Emptying those tables after working is important, since they contain an entire copy of the rest of the database. They can be emptied by clicking on the import name in the UI, and clicking “Delete”.

    Step details

    Step 1 - Export the entities to a temporary table

    Confluence

    Jira

    Confluence

    Jira



    Requirement Yogi lets you choose:

    • The scope: It is possible to restrict the export to a single Confluence space. Restricting by Jira projects is not supported (The screenshot below doesn't contain the field 'Project key' anymore).

    • The backup key: In order to avoid collisions when 2 administrators are working on imports/exports, you can specify your own key. It doesn't matter what the key is, please keep it simple.

    This step only copies all data into a single table, in preparation for the export. The table is as big as the entire database, therefore it will be important, later on, to empty this table.

    None of those long-running task should be interrupted by, for example, a Confluence restart. If it happens, please restart the step.

    Of course you can leave the page. If you lose the link, you can find the progress of the task in the "Queue" tab.

    At the end, we suggest to write the file to disk. If you have lost the link to this progress screen, you can perform this operation using the main menu:

    Step 2 - Write to disk

    Note: This step can be skipped if you prefer (or need) to copy data manually. In such situation, please copy the contents of the tables AO_32F7CE_DBBACKUPITEM and AO_32F7CE_DBBACKUPMAPPING across to the target Confluence/Jira instance, and skip to step 5.

    This step will write the contents of AO_32F7CE_DBBACKUPITEM and AO_32F7CE_DBBACKUPMAPPING into a CSV file. It can be a pretty large file, which may make you decide to copy the data manually.

    The file will be written in the home directory of Confluence, i.e. you need disk access to complete this operation.

    This step is not necessary if you are reimporting to the same instance.

    Step 3 - Delete the temporary table

    Click on the backup name in the main menu, and delete it. It is not necessary to keep it around.

    Step 4 - Load the file on the new instance

    The file will be read from a specific folder in the home directory of Confluence, i.e. you need disk access to complete this operation. The wizard will tell you where to place the file.

    Step 5 - Perform the mappings

    How to reach this step directly: In the main menu, click on the cog button next to a backup, and click "Do the mappings".

    This step can be extremely menial.

    For each entity (space, issue, project key, user...), you will have to provide the ID of the new entity in the target database, so that Requirement Yogi can "plug" itself to those entities. Fortunately, we provide an automatic mapping, which will lookup for the ID in the database, check that the title/details of the entity match the previous names, and/or it will attempt to find the new entities (such as the issue, based on the issue title). If an automatic mapping can be found, the status will be "MAPPED_AUTO". It is still necessary to check the value and eventually map manually. 

    Here are the possible statuses (matching the database column AO_32F7CE_DBBACKUPMAPPING.STATUS):

    • (null): Not mapped yet,

    • UNMAPPED: Couldn't find a match,

    • MAPPED_AUTO: Displayed as "MAPPED" + an exclamation mark "!" - It was guessed by the software,

    • MAPPED_MANUAL: Displayed as "MAPPED" + a green checkmark - It was either set manually by the user, or the user clicked the button "MAPPED" to confirm a "MAPPED_AUTO" value.

    Once all entities are mapped, you can proceed to the next step.

    Step 6 - Import

    This step erases all data in the scope, then imports the data.

    For example, if you are importing SPACE1 and have mapped SPACE1 into SPACE2, then it will erase all Requirement Yogi data related to that space, and apply the import.

    Confluence must not restart during this import. If it does, reapply the import. If you close the page, it doesn't stop the process, and you can easily come back to monitoring the progress using the "Queue" tab (or reopening the previous URL).

    Step 7 - Check the data

    If you are unhappy with the import (wrong page ID, wrong issue ID), then please come back to the Mapping page (step 5), fix the problem, then reapply the import.

    If you are happy with the import, then don't forget to delete the temporary data (delete from the UI) and the file on the disk.

    {"serverDuration": 63, "requestCorrelationId": "2cc2a9af659248a38af3895a16af72e7"}